Fitment questions?
Call (855) 786-7101 or text (801) 304-3141.
Real people. Real answers.
Product details
The 226 is a Type 1 drag cam for builds aimed at midrange and upper-rpm performance. It uses 278° of duration at 0.050 in, with 0.608 in of listed valve lift at the 1.5:1 rocker ratio.
Web Cam part number 00-302
In the box One new camshaft and three cam gear bolts with washers. Cam gear sold separately.
Representative illustration.
Fitment and ordering
For Volkswagen Type 1 pushrod engines. Match this grind to the rocker ratio and lifters in your build.
- Required lifters: Use new Web Cam performance lifters matched to this grind. Stock or reground lifters are unsuitable.
- Cam gear: Torque Web Cam’s supplied cam gear bolts to 14 ft-lb.
- Web Cam recommends 1.4:1 or 1.5:1 high-lift rockers for this grind. The listed valve lift is calculated using 1.5:1 rockers. Verify actual lift and clearances with the rockers in your engine.
Grind 226 Specifications
| Specification | Intake | Exhaust |
|---|---|---|
| Valve lift | 0.608 in (15.44 mm) | 0.608 in (15.44 mm) |
| Advertised duration | 304° | 304° |
| Duration at 0.050 in | 278° | 278° |
| Lobe center | 108° | 108° |
| Valve lash | 0.006 in | 0.006 in |
| Valve opens | 31° Before TDC | 67° Before BDC |
| Valve closes | 67° After BDC | 31° After TDC |
Check valve opening and closing at 0.050 in of valve lift with zero lash.
Installation and break-in
Clearance checks before startup
- Piston to valve: At least 0.050 in on the intake and 0.080 in on the exhaust.
- Valve to valve: Check for interference during overlap.
- Retainer to guide: At least 0.030 in at full lift.
- Spring coils: At least 0.015 in between coils at full lift.
- Free movement: Turn the assembly by hand and check that the camshaft and rockers move freely.
Assembly and first start
Coat the lobes and follower contact surfaces with assembly lube.
For the first 15 minutes of operation, keep engine speed at or above 2,000 rpm as Web Cam specifies.
Web Cam specifies this product for applications without emissions controls.